Work at Lynnwood Crossroads progressing

timthumb (1)
Lynnwood Crossroads

The site work at Lynnwood Crossroads is near 90 percent complete.

The roofs are being installed and the interior work is beginning at building 1 (Starbucks, The Joint, Great Clips, and Qdoba) and building 2 (Five Guys, Yogurtland, Pacific Dental, Best Sushi, and Verizon).

The anchor tenant, LA Fitness, is about 75 percent complete, and scheduled for a November opening.

Building 3 (Hop Jacks Restaurant) will begin construction in September. Businesses should be opening before the end of the year.

  1. I hope that the mystery 50,000 SQ. FT. building 3 is SRO’s resurrection of the Lynn Twin. Being so small, Cinebar style, 21+ with drinks and food served in the theater would do great there.

Leave a Reply

Your email address will not be published. Required fields are marked *

Real first and last names — as well as city of residence — are required for all commenters.
This is so we can verify your identity before approving your comment.